SITESTART RADAR · SAMPLE REPORT

Austin: new homes & multifamily starts by builder, for window/door, cabinet and lumber dealers

Permits issued 2026-11-10 to 2026-11-21 · Built 2026-11-24 from the City's official open data · Segment: Building-material dealers: windows & doors, cabinets, lumber/trusses
Read this first. A building permit shows that a project has been approved, not that anyone wants to buy from you. Every row below is an inferred opportunity, not a confirmed purchase intention. Check the timing notes and contact the named business through its own published channels.
238new residential building permits, 35 days
1356housing units on them
48per week (avg, weeks 2-5)
68%with a named builder

Why permits fit this buyer, and when they are too late

Live: material dealers sell into a job for months after the permit. Windows and doors are typically released at or just after permit, and cabinets, flooring and fixtures 2-4 months later. A builder who just pulled five new-home permits is a better new-account target than any single job. Too late: production builders with national supply agreements rarely switch dealers because of one permit, and long-lead custom items are sometimes ordered before the permit. Focus on small and mid-size builders.

Top opportunities in Austin

#FitOpportunity & evidenceWhere (block)Declared valueBusinesses on the permitDates & sourceRelevance note
165New single-family/townhome: 1 unit(s)
ePlan: Residential Expedited Review - New TWO Unit Bldg 2 New construction of a 2-Story Single Family Res. [3bed 2.5bath] with Attached Carport
1600 block of Canterbury St · 78702
Building Permit
not statedBuilder: Patriot BuildersIssued 2026-11-21
Observed 2026-11-24
Permit 2026-060070 BP
New home start: windows and exterior doors are usually ordered right after permit (8-12 week lead time); cabinets, flooring and fixtures 2-4 months later. Volume builders often have national supply agreements; small and mid-size builders are the realistic new accounts. Inferred, not confirmed.
257New single-family/townhome: 1 unit(s)
Unit 2401 3 story 3 bedroom 3 bathroom townhome building using the 5-Plex C prototype is plan 1499R
13200 block of Morris Rd · 78729
Building Permit
not statedBuilder: not named / individualIssued 2026-11-20
Observed 2026-11-24
Permit 2026-152520 BP
New home start: windows and exterior doors are usually ordered right after permit (8-12 week lead time); cabinets, flooring and fixtures 2-4 months later. Volume builders often have national supply agreements; small and mid-size builders are the realistic new accounts. Inferred, not confirmed.
357New single-family/townhome: 1 unit(s)
2512 (Conchos) I Right - New 2-Story Single Family Residence w opt 4 bedrooms 3.5 bathrooms opt PM Suite 2 w/ PM Bath 2 Media Rm Gourmet Kitchen and a 2 Car Garage Covered Entry Porch & Patio.
11000 block of Zip Cochise Way · 78653
Building Permit
not statedBuilder: Milestone Community Builders, LLC(MAIN)Issued 2026-11-20
Observed 2026-11-24
Permit 2026-152488 BP
New home start: windows and exterior doors are usually ordered right after permit (8-12 week lead time); cabinets, flooring and fixtures 2-4 months later. Volume builders often have national supply agreements; small and mid-size builders are the realistic new accounts. Inferred, not confirmed.
457New single-family/townhome: 1 unit(s)
SINGLE FAMILY RESIDENTIAL NEW HOME CONSTRUCTION. 2-STORY 5 BEDROOM WITH 4 BATHROOMS WITH 2 CAR GARAGE AND COVERED PATIO
11000 block of Tallsalt Dr · 78754
Building Permit
not statedBuilder: Trophy Signature HomesIssued 2026-11-20
Observed 2026-11-24
Permit 2026-151325 BP
New home start: windows and exterior doors are usually ordered right after permit (8-12 week lead time); cabinets, flooring and fixtures 2-4 months later. Volume builders often have national supply agreements; small and mid-size builders are the realistic new accounts. Inferred, not confirmed.
557New single-family/townhome: 1 unit(s)
New construction of 2 story SFR with attached garage balcony 2/2.5
0 block of Margranita Cres · 78703
Building Permit
not statedBuilder: Curlee Custom HomesIssued 2026-11-20
Observed 2026-11-24
Permit 2026-150174 BP
New home start: windows and exterior doors are usually ordered right after permit (8-12 week lead time); cabinets, flooring and fixtures 2-4 months later. Volume builders often have national supply agreements; small and mid-size builders are the realistic new accounts. Inferred, not confirmed.
657New single-family/townhome: 1 unit(s)
ePlan: Residential Expedited Review - New Construction of 2-Story Single Family Res [5bed 5.5bath] with attached garage covd porch covd patio
3400 block of Rain Forest Dr · 78746
Building Permit
not statedBuilder: Rivendale Homes Texas LLC/ Pavillian Communities Texas, LLCIssued 2026-11-19
Observed 2026-11-24
Permit 2026-152163 BP
New home start: windows and exterior doors are usually ordered right after permit (8-12 week lead time); cabinets, flooring and fixtures 2-4 months later. Volume builders often have national supply agreements; small and mid-size builders are the realistic new accounts. Inferred, not confirmed.
757New single-family/townhome: 1 unit(s)
Abilene S402 A Left New - 1 Story SFR w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
4600 block of Tumalo Dr · 78747
Building Permit
not statedBuilder: not named / individualIssued 2026-11-19
Observed 2026-11-24
Permit 2026-145283 BP
New home start: windows and exterior doors are usually ordered right after permit (8-12 week lead time); cabinets, flooring and fixtures 2-4 months later. Volume builders often have national supply agreements; small and mid-size builders are the realistic new accounts. Inferred, not confirmed.
857New single-family/townhome: 1 unit(s)
Caprock S405 C Left New - 2 Story SFR w/ 5 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
4700 block of Tumalo Dr · 78747
Building Permit
not statedBuilder: not named / individualIssued 2026-11-19
Observed 2026-11-24
Permit 2026-145205 BP
New home start: windows and exterior doors are usually ordered right after permit (8-12 week lead time); cabinets, flooring and fixtures 2-4 months later. Volume builders often have national supply agreements; small and mid-size builders are the realistic new accounts. Inferred, not confirmed.
957New single-family/townhome: 1 unit(s)
Building 2 New 2 Story SFR
7500 block of Carver Ave · 78752
Building Permit
not statedBuilder: not named / individualIssued 2026-11-19
Observed 2026-11-24
Permit 2026-125945 BP
New home start: windows and exterior doors are usually ordered right after permit (8-12 week lead time); cabinets, flooring and fixtures 2-4 months later. Volume builders often have national supply agreements; small and mid-size builders are the realistic new accounts. Inferred, not confirmed.
1057New single-family/townhome: 1 unit(s)
New single-story dwelling unit (1br/1ba)
6800 block of Raccoon Run · 78736
Building Permit
not statedBuilder: DA Tiny Homes, Inc. dba Austin Tiny HomesIssued 2026-11-19
Observed 2026-11-24
Permit 2026-100773 BP
New home start: windows and exterior doors are usually ordered right after permit (8-12 week lead time); cabinets, flooring and fixtures 2-4 months later. Volume builders often have national supply agreements; small and mid-size builders are the realistic new accounts. Inferred, not confirmed.
1157New single-family/townhome: 1 unit(s)
Single Family; 2 Story with basement 4 bed 4.5 bath 3 stories; IRC (wood framed) w/ attached 2-car garage and pool
2600 block of Woodmont Ave · 78703
Building Permit
not statedBuilder: GOSSETT & COMPANY LLCIssued 2026-11-19
Observed 2026-11-24
Permit 2026-143796 BP
New home start: windows and exterior doors are usually ordered right after permit (8-12 week lead time); cabinets, flooring and fixtures 2-4 months later. Volume builders often have national supply agreements; small and mid-size builders are the realistic new accounts. Inferred, not confirmed.
1257New single-family/townhome: 1 unit(s)
Eisenhower S406 C Right New - 2 Story SFR w/ 5 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
4500 block of Tumalo Dr · 78747
Building Permit
not statedBuilder: not named / individualIssued 2026-11-19
Observed 2026-11-24
Permit 2026-145236 BP
New home start: windows and exterior doors are usually ordered right after permit (8-12 week lead time); cabinets, flooring and fixtures 2-4 months later. Volume builders often have national supply agreements; small and mid-size builders are the realistic new accounts. Inferred, not confirmed.
1357New single-family/townhome: 1 unit(s)
New Construction of a single building based on Volume Builder approved (2024-067871 VB) Plan 11-DB-L. This is a 3 story building with height of 38 and 3405 square feet.
9800 block of Ribelin Ranch Ct · 78750
Building Permit
not statedBuilder: Prominence Avery LPIssued 2026-11-19
Observed 2026-11-24
Permit 2026-150335 BP
New home start: windows and exterior doors are usually ordered right after permit (8-12 week lead time); cabinets, flooring and fixtures 2-4 months later. Volume builders often have national supply agreements; small and mid-size builders are the realistic new accounts. Inferred, not confirmed.
1457New single-family/townhome: 1 unit(s)
New construction of a 2-story single family dwelling in a condo regime. 3 Bedrooms 2.5 Bathrooms with attached 2 car garage
8000 block of Ermis Farm Rd · 78745
Building Permit
not statedBuilder: New Home CoIssued 2026-11-19
Observed 2026-11-24
Permit 2026-150989 BP
New home start: windows and exterior doors are usually ordered right after permit (8-12 week lead time); cabinets, flooring and fixtures 2-4 months later. Volume builders often have national supply agreements; small and mid-size builders are the realistic new accounts. Inferred, not confirmed.
1557New single-family/townhome: 1 unit(s)
New construction of 2 story Duplex condo 3 beds 2.5 baths attached garage attached covered patio (8112 bird song cir)
8100 block of Bird Song Cir · 78745
Building Permit
not statedBuilder: New Home CoIssued 2026-11-18
Observed 2026-11-24
Permit 2026-150627 BP
New home start: windows and exterior doors are usually ordered right after permit (8-12 week lead time); cabinets, flooring and fixtures 2-4 months later. Volume builders often have national supply agreements; small and mid-size builders are the realistic new accounts. Inferred, not confirmed.
1657New single-family/townhome: 1 unit(s)
ePlan: Residential Expedited Review - New construction of 2-Story Single Family Res. [5bed 4bath] with habitable attic attached garage covd porch
1600 block of Sylvan Glade · 78745
Building Permit
not statedBuilder: Drew HomesIssued 2026-11-18
Observed 2026-11-24
Permit 2026-149217 BP
New home start: windows and exterior doors are usually ordered right after permit (8-12 week lead time); cabinets, flooring and fixtures 2-4 months later. Volume builders often have national supply agreements; small and mid-size builders are the realistic new accounts. Inferred, not confirmed.

Most active builders on new residential permits (Austin, last 35 days)

New-account targets: businesses pulling the most qualifying permits in the last 35 days. Counts are from the city's records, values are declared permit valuations, not contract amounts.

#BusinessQualifying permitsDeclared value
1OHT Construction LLC19$19,000,000
2Trophy Signature Homes8not stated
3Greater General Construction LLC8not stated
4Milestone Community Builders, LLC(MAIN)7not stated
5Taylor Morrison of Texas, Inc.7not stated
6Perry Homes LLC6not stated
7New Home Co5not stated
8Prominence Homes, LLC5not stated
9Paradisa Homes, LLC5not stated
10Andres Construction Services, LLC4$4,000,000

Method and limits

Source: City of Austin Open Data, Issued Construction Permits (3syk-w9eu), retrieved 2026-11-24. Included: Building permits for new single-family (R-101), two-to-four family and new multifamily (C-103/104/105), status Active, issued in the last 14 days; duplicate buildings from the same builder on the same block are shown once. Austin leaves valuation blank on most new-home permits, so this report ranks by builder activity and unit count instead of dollar value. Each row links to the City's own permit page.